How time flies… the two Mobius towers have replaced the Blue Tower where we had already done some work 37 years ago…

For the new Towers, we were responsible for the cladding of the columns in 316 BA stainless steel. Tower 1 opened in January 2020 and Tower 2 in March 2022.

A total of 36 column claddings with a diameter of 750 mm and a height of 2.5 metres were installed in two shells and 15 column claddings with a diameter of 950 mm and a height of 7.5 metres were installed in three shells.

The fastening of the shells was carried out according to our procedures, i.e. by interlocking on secondary dies without visible fixtures and vertical adjustment by slides.

For more than 40 years, FEREX.BE has been producing column cladding in Belgium and abroad in all materials and types.

Architect: ASSAR Architects