{"id":995,"date":"2021-04-14T09:47:23","date_gmt":"2021-04-14T07:47:23","guid":{"rendered":"http:\/\/www.ferex.be\/en\/?p=995"},"modified":"2021-04-14T09:47:27","modified_gmt":"2021-04-14T07:47:27","slug":"city-2","status":"publish","type":"post","link":"https:\/\/www.ferex.be\/en\/metal-sheet-covering\/city-2\/","title":{"rendered":"City 2"},"content":{"rendered":"<p>[et_pb_section fb_built=\u00a0\u00bb1&Prime; _builder_version=\u00a0\u00bb3.22.3&Prime;][et_pb_row _builder_version=\u00a0\u00bb3.25&Prime; background_size=\u00a0\u00bbinitial\u00a0\u00bb background_position=\u00a0\u00bbtop_left\u00a0\u00bb background_repeat=\u00a0\u00bbrepeat\u00a0\u00bb][et_pb_column type=\u00a0\u00bb4_4&Prime; _builder_version=\u00a0\u00bb3.25&Prime; custom_padding=\u00a0\u00bb|||\u00a0\u00bb custom_padding__hover=\u00a0\u00bb|||\u00a0\u00bb][et_pb_text _builder_version=\u00a0\u00bb4.9.4&Prime; hover_enabled=\u00a0\u00bb0&Prime; sticky_enabled=\u00a0\u00bb0&Prime;]<\/p>\n<p>The renovation of the various commercial spaces was a real challenge.<br \/>We had several requirements to manage:<br \/>Work only at night from 8.00 pm to 5.00 am.<br \/>Security and daily cleaning after work.<br \/>Management of storage and handling in small spaces.<br \/>Realization of the \u00ab\u00a0Kit\u00a0\u00bb units<br \/>Tight deadlines, tolerance of the existing rough structure is random.<br \/>ALTIPLAN Architects entrusted us with the finishing work.<br \/>&#8211; The cladding of the 212 mullions including various commercial techniques.<br \/>&#8211; The cladding of the 84 columns, made of lacquered perforated steel type Ral 9003 and 9005 30% + Plexi M1.<br \/>The interior LEDs are arranged vertically according to a precise layout.<br \/>An adjustable stainless-steel plinth is used for the finishing touches.<br \/>&#8211; The lacquered monumental metallic staircase type RAL 9005, equipped with glass GC and stainless-steel MC.<br \/>&#8211; The 345 MCT of GC in bolted glass of H 1750 mm on new structures and based on a 3 mm aluminium cladding Ral 9003 and 9005.<\/p>\n<p>The glass connections to the escalators have been fixed only to the concrete beams of the slabs, they are all cantilevered.<br \/>&#8211; Two monumental \u00ab\u00a0TOTEM\u00a0\u00bb columns placed at the Rue Neuve and Bd Botanique&rsquo;s entrance are the headlights of the premises.<\/p>\n<p>This significant renovation brings us into a new dimension of \u00ab\u00a0well-being\u00a0\u00bb.<\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][et_pb_row _builder_version=\u00a0\u00bb3.25&Prime; background_size=\u00a0\u00bbinitial\u00a0\u00bb background_position=\u00a0\u00bbtop_left\u00a0\u00bb background_repeat=\u00a0\u00bbrepeat\u00a0\u00bb][et_pb_column type=\u00a0\u00bb4_4&Prime; _builder_version=\u00a0\u00bb3.25&Prime; custom_padding=\u00a0\u00bb|||\u00a0\u00bb custom_padding__hover=\u00a0\u00bb|||\u00a0\u00bb][et_pb_gallery gallery_ids=\u00a0\u00bb998,999,1000,1001,1002,1003,1004,1005,1006,1007&Prime; posts_number=\u00a0\u00bb12&Prime; db_image_max_width_tablet=\u00a0\u00bb51&Prime; db_image_max_height_tablet=\u00a0\u00bb501&Prime; db_image_row_spacing_tablet=\u00a0\u00bb51&Prime; db_image_center_titles=\u00a0\u00bbleft\u00a0\u00bb db_image_object_fit=\u00a0\u00bbinitial\u00a0\u00bb show_title_and_caption=\u00a0\u00bboff\u00a0\u00bb show_pagination=\u00a0\u00bboff\u00a0\u00bb zoom_icon_color=\u00a0\u00bbrgba(0,0,0,0.12)\u00a0\u00bb _builder_version=\u00a0\u00bb4.9.4&Prime; hover_enabled=\u00a0\u00bb0&Prime; pagination_font_size_tablet=\u00a0\u00bb51&Prime; pagination_line_height_tablet=\u00a0\u00bb2&Prime; sticky_enabled=\u00a0\u00bb0&Prime;][\/et_pb_gallery][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The renovation of the various commercial spaces was a real challenge.We had several requirements to manage:Work only at night from 8.00 pm to 5.00 am.Security and daily cleaning after work.Management of storage and handling in small spaces.Realization of the \u00ab\u00a0Kit\u00a0\u00bb unitsTight deadlines, tolerance of the existing rough structure is random.ALTIPLAN Architects entrusted us with the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":998,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":""},"categories":[12,18,11],"tags":[],"_links":{"self":[{"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/posts\/995"}],"collection":[{"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/comments?post=995"}],"version-history":[{"count":2,"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/posts\/995\/revisions"}],"predecessor-version":[{"id":1008,"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/posts\/995\/revisions\/1008"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/media\/998"}],"wp:attachment":[{"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/media?parent=995"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/categories?post=995"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/tags?post=995"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}