{"id":1175,"date":"2024-08-27T08:48:18","date_gmt":"2024-08-27T06:48:18","guid":{"rendered":"https:\/\/www.ferex.be\/en\/?p=1175"},"modified":"2024-08-27T08:49:21","modified_gmt":"2024-08-27T06:49:21","slug":"city-2-2","status":"publish","type":"post","link":"https:\/\/www.ferex.be\/en\/metal-sheet-covering\/city-2-2\/","title":{"rendered":"City 2"},"content":{"rendered":"<p>[et_pb_section fb_built=\u00a0\u00bb1&Prime; _builder_version=\u00a0\u00bb4.16&Prime; global_colors_info=\u00a0\u00bb{}\u00a0\u00bb theme_builder_area=\u00a0\u00bbpost_content\u00a0\u00bb][et_pb_row _builder_version=\u00a0\u00bb4.16&Prime; background_size=\u00a0\u00bbinitial\u00a0\u00bb background_position=\u00a0\u00bbtop_left\u00a0\u00bb background_repeat=\u00a0\u00bbrepeat\u00a0\u00bb global_colors_info=\u00a0\u00bb{}\u00a0\u00bb theme_builder_area=\u00a0\u00bbpost_content\u00a0\u00bb][et_pb_column type=\u00a0\u00bb4_4&Prime; _builder_version=\u00a0\u00bb4.16&Prime; custom_padding=\u00a0\u00bb|||\u00a0\u00bb global_colors_info=\u00a0\u00bb{}\u00a0\u00bb custom_padding__hover=\u00a0\u00bb|||\u00a0\u00bb theme_builder_area=\u00a0\u00bbpost_content\u00a0\u00bb][et_pb_text _builder_version=\u00a0\u00bb4.27.0&Prime; hover_enabled=\u00a0\u00bb0&Prime; global_colors_info=\u00a0\u00bb{}\u00a0\u00bb theme_builder_area=\u00a0\u00bbpost_content\u00a0\u00bb sticky_enabled=\u00a0\u00bb0&Prime;]<\/p>\n<p><span class=\"s3\">After having carried out work on various interior spaces in CITY\u00a02, glass guardrail, the cladding of the floor openings and columns, the monumental staircase, the decoration of the central hall and entrances, we studied and renovated the external fa\u00e7ades.<\/span><\/p>\n<p><span class=\"s3\">The works were carried out in the areas along the Bd Botanique, Rue Neuve and Rue de la Blanchisserie.<\/span><\/p>\n<p><span class=\"s3\">The challenge was to carry out the work without obscuring the shop windows and the entrances. 110\u00a0m\u00b3 of scaffolding were put up in order to carry out the renovation works, namely:<\/span><\/p>\n<p><span class=\"s3\">The new shop windows using bonded glazing and automatic entrance doors, the lacquered aluminium awnings, the curtain walls, the cladding of the columns that are able to support shop signs.<\/span><\/p>\n<p><span class=\"s3\">As well as the entrances on Bd Botanique &#8211; Rue Neuve, the bridge over Rue de la Blanchisserie.<\/span><\/p>\n<p><span class=\"s3\">But also the aluminium friezes, the glass cladding with silkscreen printing, the entrance doors with a decorative stainless steel coating on Rue de la Blanchisserie.<\/span><\/p>\n<p><span class=\"s3\">The challenge: we developed galvanised supports measuring from 0 to 700\u00a0mm standing out from the constructions on the fa\u00e7ades that were able to hold and support all the new fa\u00e7ade cladding elements.<\/span><\/p>\n<p><span class=\"s3\">Furthermore, we carried out our work in accordance with the PEB standards (standards of energy performance of buildings), which are always very complicated when carrying out a partial renovation.<\/span><\/p>\n<p><span class=\"s3\">The new design adds another dimension to the building and also to Rue Neuve; it links City\u00a02 with the Galeria Inno building on which we had also worked at the beginning of the 2000s\u2026<\/span><\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][et_pb_row _builder_version=\u00a0\u00bb4.16&Prime; background_size=\u00a0\u00bbinitial\u00a0\u00bb background_position=\u00a0\u00bbtop_left\u00a0\u00bb background_repeat=\u00a0\u00bbrepeat\u00a0\u00bb global_colors_info=\u00a0\u00bb{}\u00a0\u00bb theme_builder_area=\u00a0\u00bbpost_content\u00a0\u00bb][et_pb_column type=\u00a0\u00bb4_4&Prime; _builder_version=\u00a0\u00bb4.16&Prime; custom_padding=\u00a0\u00bb|||\u00a0\u00bb global_colors_info=\u00a0\u00bb{}\u00a0\u00bb custom_padding__hover=\u00a0\u00bb|||\u00a0\u00bb theme_builder_area=\u00a0\u00bbpost_content\u00a0\u00bb][et_pb_gallery gallery_ids=\u00a0\u00bb1178,1179,1180,1181,1182,1183,1184,1185&Prime; posts_number=\u00a0\u00bb12&Prime; db_image_max_width_tablet=\u00a0\u00bb51&Prime; db_image_max_height_tablet=\u00a0\u00bb501&Prime; db_image_row_spacing_tablet=\u00a0\u00bb51&Prime; db_image_center_titles=\u00a0\u00bbleft\u00a0\u00bb db_image_object_fit=\u00a0\u00bbinitial\u00a0\u00bb dbdb_version=\u00a0\u00bb4.0.8&Prime; show_title_and_caption=\u00a0\u00bboff\u00a0\u00bb show_pagination=\u00a0\u00bboff\u00a0\u00bb zoom_icon_color=\u00a0\u00bbrgba(0,0,0,0.12)\u00a0\u00bb _builder_version=\u00a0\u00bb4.27.0&Prime; hover_enabled=\u00a0\u00bb0&Prime; pagination_font_size_tablet=\u00a0\u00bb51&Prime; pagination_line_height_tablet=\u00a0\u00bb2&Prime; global_colors_info=\u00a0\u00bb{}\u00a0\u00bb theme_builder_area=\u00a0\u00bbpost_content\u00a0\u00bb sticky_enabled=\u00a0\u00bb0&Prime;][\/et_pb_gallery][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>After having carried out work on various interior spaces in CITY\u00a02, glass guardrail, the cladding of the floor openings and columns, the monumental staircase, the decoration of the central hall and entrances, we studied and renovated the external fa\u00e7ades. The works were carried out in the areas along the Bd Botanique, Rue Neuve and Rue [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1172,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":""},"categories":[22,11],"tags":[],"_links":{"self":[{"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/posts\/1175"}],"collection":[{"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/comments?post=1175"}],"version-history":[{"count":2,"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/posts\/1175\/revisions"}],"predecessor-version":[{"id":1186,"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/posts\/1175\/revisions\/1186"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/media\/1172"}],"wp:attachment":[{"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/media?parent=1175"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/categories?post=1175"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/tags?post=1175"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}