{"id":1138,"date":"2023-01-26T11:33:31","date_gmt":"2023-01-26T10:33:31","guid":{"rendered":"http:\/\/www.ferex.be\/en\/?p=1138"},"modified":"2023-01-26T11:33:35","modified_gmt":"2023-01-26T10:33:35","slug":"quatuor-beobank","status":"publish","type":"post","link":"https:\/\/www.ferex.be\/en\/lining\/quatuor-beobank\/","title":{"rendered":"Quatuor BEOBANK"},"content":{"rendered":"<p>[et_pb_section fb_built=\u00a0\u00bb1&Prime; _builder_version=\u00a0\u00bb4.16&Prime; global_colors_info=\u00a0\u00bb{}\u00a0\u00bb theme_builder_area=\u00a0\u00bbpost_content\u00a0\u00bb][et_pb_row _builder_version=\u00a0\u00bb4.16&Prime; background_size=\u00a0\u00bbinitial\u00a0\u00bb background_position=\u00a0\u00bbtop_left\u00a0\u00bb background_repeat=\u00a0\u00bbrepeat\u00a0\u00bb global_colors_info=\u00a0\u00bb{}\u00a0\u00bb theme_builder_area=\u00a0\u00bbpost_content\u00a0\u00bb][et_pb_column type=\u00a0\u00bb4_4&Prime; _builder_version=\u00a0\u00bb4.16&Prime; custom_padding=\u00a0\u00bb|||\u00a0\u00bb global_colors_info=\u00a0\u00bb{}\u00a0\u00bb custom_padding__hover=\u00a0\u00bb|||\u00a0\u00bb theme_builder_area=\u00a0\u00bbpost_content\u00a0\u00bb][et_pb_text _builder_version=\u00a0\u00bb4.19.5&Prime; hover_enabled=\u00a0\u00bb0&Prime; global_colors_info=\u00a0\u00bb{}\u00a0\u00bb theme_builder_area=\u00a0\u00bbpost_content\u00a0\u00bb sticky_enabled=\u00a0\u00bb0&Prime;]<\/p>\n<p>The dynamic and decorative structure in the reception hall required extensive study as to its stability and design.<\/p>\n<p>The structure of the metal base is located 2.5 metres from the decorative structure. It also serves as a service passage. This structure is covered with lacquered plaster panels.<\/p>\n<p>The cantilevered assembly has been designed taking into account bending, compression, tension and torsion so as to be dimensionally stable.<\/p>\n<p>The tubular spacers are made of lacquered steel and are 2.5 M long. They form the link between the steel frame and the decorative aluminium unit.<\/p>\n<p>The 4 horizontal tubular structures are made of reconstituted aluminium profiles and are assembled by invisible welds and dowels.<\/p>\n<p>These are drilled with 2 x 96 holes to accommodate the pivot pins and also with 2 x 96 gear-type cut-outs to orient each fin in 6 different positions.<\/p>\n<p>Assembly templates were needed to obtain reference points and to carry out continuous laser checks during installation, given the tolerances of + &#8211; 1.5 MM.<\/p>\n<p>The 288 fins have been specially designed and extruded for this project in 250X25 mm profiles.<\/p>\n<p>Architect:\u00a0\u00a0 Jaspers-Eyers Architects<\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][et_pb_row _builder_version=\u00a0\u00bb4.16&Prime; background_size=\u00a0\u00bbinitial\u00a0\u00bb background_position=\u00a0\u00bbtop_left\u00a0\u00bb background_repeat=\u00a0\u00bbrepeat\u00a0\u00bb global_colors_info=\u00a0\u00bb{}\u00a0\u00bb theme_builder_area=\u00a0\u00bbpost_content\u00a0\u00bb][et_pb_column type=\u00a0\u00bb4_4&Prime; _builder_version=\u00a0\u00bb4.16&Prime; custom_padding=\u00a0\u00bb|||\u00a0\u00bb global_colors_info=\u00a0\u00bb{}\u00a0\u00bb custom_padding__hover=\u00a0\u00bb|||\u00a0\u00bb theme_builder_area=\u00a0\u00bbpost_content\u00a0\u00bb][et_pb_gallery gallery_ids=\u00a0\u00bb1141,1142,1143,1144,1145&Prime; posts_number=\u00a0\u00bb12&Prime; db_image_max_width_tablet=\u00a0\u00bb51&Prime; db_image_max_height_tablet=\u00a0\u00bb501&Prime; db_image_row_spacing_tablet=\u00a0\u00bb51&Prime; db_image_center_titles=\u00a0\u00bbleft\u00a0\u00bb db_image_object_fit=\u00a0\u00bbinitial\u00a0\u00bb dbdb_version=\u00a0\u00bb4.0.8&Prime; show_title_and_caption=\u00a0\u00bboff\u00a0\u00bb show_pagination=\u00a0\u00bboff\u00a0\u00bb zoom_icon_color=\u00a0\u00bbrgba(0,0,0,0.12)\u00a0\u00bb _builder_version=\u00a0\u00bb4.19.5&Prime; hover_enabled=\u00a0\u00bb0&Prime; pagination_font_size_tablet=\u00a0\u00bb51&Prime; pagination_line_height_tablet=\u00a0\u00bb2&Prime; global_colors_info=\u00a0\u00bb{}\u00a0\u00bb theme_builder_area=\u00a0\u00bbpost_content\u00a0\u00bb sticky_enabled=\u00a0\u00bb0&Prime;][\/et_pb_gallery][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The dynamic and decorative structure in the reception hall required extensive study as to its stability and design. The structure of the metal base is located 2.5 metres from the decorative structure. It also serves as a service passage. This structure is covered with lacquered plaster panels. The cantilevered assembly has been designed taking into [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1141,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":""},"categories":[20],"tags":[],"_links":{"self":[{"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/posts\/1138"}],"collection":[{"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/comments?post=1138"}],"version-history":[{"count":2,"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/posts\/1138\/revisions"}],"predecessor-version":[{"id":1146,"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/posts\/1138\/revisions\/1146"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/media\/1141"}],"wp:attachment":[{"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/media?parent=1138"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/categories?post=1138"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/tags?post=1138"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}