{"id":1114,"date":"2023-01-26T11:17:23","date_gmt":"2023-01-26T10:17:23","guid":{"rendered":"http:\/\/www.ferex.be\/en\/?p=1114"},"modified":"2023-01-26T11:17:50","modified_gmt":"2023-01-26T10:17:50","slug":"mobius","status":"publish","type":"post","link":"https:\/\/www.ferex.be\/en\/columns-and-ceilings\/mobius\/","title":{"rendered":"MOBIUS"},"content":{"rendered":"<p>[et_pb_section fb_built=\u00a0\u00bb1&Prime; _builder_version=\u00a0\u00bb4.16&Prime; global_colors_info=\u00a0\u00bb{}\u00a0\u00bb][et_pb_row _builder_version=\u00a0\u00bb4.16&Prime; background_size=\u00a0\u00bbinitial\u00a0\u00bb background_position=\u00a0\u00bbtop_left\u00a0\u00bb background_repeat=\u00a0\u00bbrepeat\u00a0\u00bb global_colors_info=\u00a0\u00bb{}\u00a0\u00bb][et_pb_column type=\u00a0\u00bb4_4&Prime; _builder_version=\u00a0\u00bb4.16&Prime; custom_padding=\u00a0\u00bb|||\u00a0\u00bb global_colors_info=\u00a0\u00bb{}\u00a0\u00bb custom_padding__hover=\u00a0\u00bb|||\u00a0\u00bb][et_pb_text _builder_version=\u00a0\u00bb4.19.5&Prime; global_colors_info=\u00a0\u00bb{}\u00a0\u00bb]<\/p>\n<p>How time flies&#8230; the two Mobius towers have replaced the Blue Tower where we had already done some work 37 years ago&#8230;<\/p>\n<p>For the new Towers, we were responsible for the cladding of the columns in 316 BA stainless steel. Tower 1 opened in January 2020 and Tower 2 in March 2022.<\/p>\n<p>A total of 36 column claddings with a diameter of 750 mm and a height of 2.5 metres were installed in two shells and 15 column claddings with a diameter of 950 mm and a height of 7.5 metres were installed in three shells.<\/p>\n<p>The fastening of the shells was carried out according to our procedures, i.e. by interlocking on secondary dies without visible fixtures and vertical adjustment by slides.<\/p>\n<p>For more than 40 years, FEREX.BE has been producing column cladding in Belgium and abroad in all materials and types.<\/p>\n<p>Architect: ASSAR Architects<\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][et_pb_row _builder_version=\u00a0\u00bb4.16&Prime; background_size=\u00a0\u00bbinitial\u00a0\u00bb background_position=\u00a0\u00bbtop_left\u00a0\u00bb background_repeat=\u00a0\u00bbrepeat\u00a0\u00bb global_colors_info=\u00a0\u00bb{}\u00a0\u00bb][et_pb_column type=\u00a0\u00bb4_4&Prime; _builder_version=\u00a0\u00bb4.16&Prime; custom_padding=\u00a0\u00bb|||\u00a0\u00bb global_colors_info=\u00a0\u00bb{}\u00a0\u00bb custom_padding__hover=\u00a0\u00bb|||\u00a0\u00bb][et_pb_gallery gallery_ids=\u00a0\u00bb1117,1118,1119,1120,1121,1122,1123&Prime; posts_number=\u00a0\u00bb12&Prime; db_image_max_width_tablet=\u00a0\u00bb51&Prime; db_image_max_height_tablet=\u00a0\u00bb501&Prime; db_image_row_spacing_tablet=\u00a0\u00bb51&Prime; db_image_center_titles=\u00a0\u00bbleft\u00a0\u00bb db_image_object_fit=\u00a0\u00bbinitial\u00a0\u00bb dbdb_version=\u00a0\u00bb4.0.8&Prime; show_title_and_caption=\u00a0\u00bboff\u00a0\u00bb show_pagination=\u00a0\u00bboff\u00a0\u00bb zoom_icon_color=\u00a0\u00bbrgba(0,0,0,0.12)\u00a0\u00bb _builder_version=\u00a0\u00bb4.19.5&Prime; pagination_font_size_tablet=\u00a0\u00bb51&Prime; pagination_line_height_tablet=\u00a0\u00bb2&Prime; global_colors_info=\u00a0\u00bb{}\u00a0\u00bb][\/et_pb_gallery][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>How time flies&#8230; the two Mobius towers have replaced the Blue Tower where we had already done some work 37 years ago&#8230; For the new Towers, we were responsible for the cladding of the columns in 316 BA stainless steel. Tower 1 opened in January 2020 and Tower 2 in March 2022. A total of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1117,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":""},"categories":[22],"tags":[],"_links":{"self":[{"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/posts\/1114"}],"collection":[{"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/comments?post=1114"}],"version-history":[{"count":3,"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/posts\/1114\/revisions"}],"predecessor-version":[{"id":1125,"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/posts\/1114\/revisions\/1125"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/media\/1117"}],"wp:attachment":[{"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/media?parent=1114"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/categories?post=1114"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/tags?post=1114"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}