{"id":1009,"date":"2021-04-14T09:50:12","date_gmt":"2021-04-14T07:50:12","guid":{"rendered":"http:\/\/www.ferex.be\/en\/?p=1009"},"modified":"2021-04-14T09:50:34","modified_gmt":"2021-04-14T07:50:34","slug":"crystal-city","status":"publish","type":"post","link":"https:\/\/www.ferex.be\/en\/decoration\/crystal-city\/","title":{"rendered":"CRYSTAL CITY"},"content":{"rendered":"<p>[et_pb_section fb_built=\u00a0\u00bb1&Prime; _builder_version=\u00a0\u00bb3.22.3&Prime;][et_pb_row _builder_version=\u00a0\u00bb3.25&Prime; background_size=\u00a0\u00bbinitial\u00a0\u00bb background_position=\u00a0\u00bbtop_left\u00a0\u00bb background_repeat=\u00a0\u00bbrepeat\u00a0\u00bb][et_pb_column type=\u00a0\u00bb4_4&Prime; _builder_version=\u00a0\u00bb3.25&Prime; custom_padding=\u00a0\u00bb|||\u00a0\u00bb custom_padding__hover=\u00a0\u00bb|||\u00a0\u00bb][et_pb_text _builder_version=\u00a0\u00bb4.9.4&Prime; hover_enabled=\u00a0\u00bb0&Prime; sticky_enabled=\u00a0\u00bb0&Prime;]<\/p>\n<p>After long-term studies in close cooperation with the Art&amp;Build Architecture Office, we have developed a 3D awning of 100 MCT.<\/p>\n<p>It consists of 426 different triangles.<\/p>\n<p>Based on a lightweight frame placed on a template structure, we had spacers predefined to the millimetre.<\/p>\n<p>This ULTRA precise execution was the success of the project.<\/p>\n<p>Based on studies, drawings, production layouts, formatting, laser marking, everything was managed by highly qualified and experienced personnel,<\/p>\n<p>At each phase of the construction process we have checked the parameters and the production by the \u00ab\u00a0quality control\u00a0\u00bb department.<\/p>\n<p>As you can see, each triangular cassette finds its place according to a predefined methodology.<\/p>\n<p>As the entire awning is 3D, each cassette is attached to the tracks and spacers by means of ball joint fasteners.<\/p>\n<p>The processing of the 3mm thick AG3 alloy cassettes was particularly important given the impact of daytime and night light.<\/p>\n<p>After several tests, we painted them in RAL 9005 75%.<\/p>\n<p>Subsequently a LEDs network will be installed between the cassettes.<\/p>\n<p>An additional study was carried out to finish the awning at both ends with two 3D columns.<\/p>\n<p>This fluid assembly is the signal at the Bd Anspach towards the Square Debrouk\u00e8re.<\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][et_pb_row _builder_version=\u00a0\u00bb3.25&Prime; background_size=\u00a0\u00bbinitial\u00a0\u00bb background_position=\u00a0\u00bbtop_left\u00a0\u00bb background_repeat=\u00a0\u00bbrepeat\u00a0\u00bb][et_pb_column type=\u00a0\u00bb4_4&Prime; _builder_version=\u00a0\u00bb3.25&Prime; custom_padding=\u00a0\u00bb|||\u00a0\u00bb custom_padding__hover=\u00a0\u00bb|||\u00a0\u00bb][et_pb_gallery gallery_ids=\u00a0\u00bb1012,1013,1014,1015,1016,1017,1018,1019&Prime; posts_number=\u00a0\u00bb12&Prime; db_image_max_width_tablet=\u00a0\u00bb51&Prime; db_image_max_height_tablet=\u00a0\u00bb501&Prime; db_image_row_spacing_tablet=\u00a0\u00bb51&Prime; db_image_center_titles=\u00a0\u00bbleft\u00a0\u00bb db_image_object_fit=\u00a0\u00bbinitial\u00a0\u00bb show_title_and_caption=\u00a0\u00bboff\u00a0\u00bb show_pagination=\u00a0\u00bboff\u00a0\u00bb zoom_icon_color=\u00a0\u00bbrgba(0,0,0,0.12)\u00a0\u00bb _builder_version=\u00a0\u00bb4.9.4&Prime; hover_enabled=\u00a0\u00bb0&Prime; pagination_font_size_tablet=\u00a0\u00bb51&Prime; pagination_line_height_tablet=\u00a0\u00bb2&Prime; sticky_enabled=\u00a0\u00bb0&Prime;][\/et_pb_gallery][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>After long-term studies in close cooperation with the Art&amp;Build Architecture Office, we have developed a 3D awning of 100 MCT. It consists of 426 different triangles. Based on a lightweight frame placed on a template structure, we had spacers predefined to the millimetre. This ULTRA precise execution was the success of the project. Based on [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1019,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":""},"categories":[12,17,18],"tags":[],"_links":{"self":[{"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/posts\/1009"}],"collection":[{"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/comments?post=1009"}],"version-history":[{"count":2,"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/posts\/1009\/revisions"}],"predecessor-version":[{"id":1020,"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/posts\/1009\/revisions\/1020"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/media\/1019"}],"wp:attachment":[{"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/media?parent=1009"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/categories?post=1009"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ferex.be\/en\/wp-json\/wp\/v2\/tags?post=1009"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}